We will have a third generator installed as a redundant machine in a n=2 + 1 configuration
This machine will be used for:
- Backup should either one of the other engines fail or be taken offline for planned maintenance;
- Peak lobbing – Reducing peak demand usage;
- Backup power in case of load shedding or municipal power failure.